Saturday 30 January 2016

The importance of the team in Technology Projects

Last November SYB did a lecture at Politecnico of Turin, about the importance of the team to transform an Idea in a Real Company.

The 3 most important things that came our were:
  • Execution and hard work are essential; as Lori Greiner said “Entrepreneurs are willing to work 80 hours a week to avoid working 40 hours a week.”
  • The only way to transform an idea to a real Company is to clearly define the Process.
  • People of the team have to have different personality in order to give their best as Myers-Briggs Study explained.


You can check all the presentation in Slide Share and our open job position in AngeList


Saturday 23 January 2016

SEE YOUR BOX MONITORS “IL TRONO DELLE GRAZIE” FOR MUSEUM OF VATICAN STATE



In the domain of fine arts, one of the biggest challenges is transportation. The artwork is carried out by different players (owners, transport companies, exhibitors and or restorers).

SYB service suits the requests of the masterpieces’ owners of that require real time nail to nail real-time monitoring. 

Vrancke van der Stockt, 
Il Trono delle Grazie, Catalgirone

The CUSTOMER’S view point
The customer, Musei Vaticani, Diocesi Catalgirone, needs to send their main masterpiece to Rome for top professional restoration. The masterpiece is a wooden painting dated around 1500 valued almost Euro 0.5 million. The Masterpiece “Il Trono delle Grazie”, had to be monitored at all time during the transport. Critical aspects such as temperature, humidity, box opening and shocks had to be checked and recorded in real-time.

SEE YOUR BOX’S SOLUTION
The SYB monitoring and alert service tailored to the transport. In agreement with the owner all critical parameters were set and uploaded to the system. The owner had then been given visibility at all time of the trip of the “Trono delle Grazie”.  SYB’s ability to send preventive alerts to the customer, the logistic company and the restorers’ team was key to the success of the operation.  The moment itself one of the parameters went out of specs an immediate report was compiled and sent allowing the involved parties to take immediate actions preventing damages to the masterpiece.


In this way all stakeholders could not only to track the masterpiece from Catalgirone to Rome, but also monitor its conditions and intervene in real time.

Transportation results:                                  
Reading Frequency 10min                             
Transmitting Frequency 30min                    
Shipment Date [24-27]/11/15    
Average Temperature: (°C) 18,339631
Average Humidity (%) 40,398489
Threshold Temperature (°C) [16-24]
Threshold Humidity (%) [45-65]
Shock Detection: (g) 3